Pine Heath

Pine Heath

Pine Heath is a whole-house renovation, retrofit and refurbishment that combines a significant improvement in energy performance with a carefully considered transformation of the interior to suit a growing family.

Free Resource (Log-in Required)
To download this resource simply log-in or create an account – for free – in just a few clicks.

The five-storey terraced house is located in Hamsptead, north London, within the Hampstead Conservation Area. This placed some restrictions on alterations to the exterior, including the fenestration, which needed to remain consistent with the other houses within the original development.

The site was originally a garden nursery. In the mid-1960s it was purchased by a contractor-developer, who worked with Benjamin Levy & Partners to develop a small collection of houses. Each house is rotated off perpendicular to the street, providing privacy while allowing more daylight to enter the interiors.

When Studio Hagen Hall was appointed by the client to revive the property, it was in a tired condition, but with several of its original modernist features intact, including a striking staircase, which rises through the centre of the home, and Paraná pine ceilings and wall cladding.

The brief comprised three key areas: space planning, storage and interior architecture; energy performance; and materiality.

Much of the original layout of house was retained, with its function and connectivity transformed primarily through the introduction of large-scale joinery interventions. The adapted arrangement creates a more logical connection between the entrance, kitchen and living spaces, while providing extensive storage and greater multifunctionality. Rooms were designed to evolve with the family, including a guest bedroom that doubles as a gym and an eaves-level office and bed pod. Modular joinery and movable partitions allow spaces to be reconfigured in the future with minimal waste.

The environmental retrofit strategy included upgrading windows and insulation, and installing an air source heat pump and solar panels. These measures resulted in a 77% reduction in heating demand, and were designed and delivered in a way that meant that the embodied carbon of the retrofit was calculated to be offset within just 1.2 years.

The final element of the brief was to update the feel and appearance of the interiors while restoring and reinstating key modernist characteristics and material palettes throughout the house.

More case studies