Walking through Hackney two decades ago, you would have been used to a cacophony of construction. Major developments were unfolding, as the area entered a serious regeneration effort both ahead and after the 2012 London Olympics. Cranes, concrete and steel were a constant. Noisy trucks, jackhammers and disruption.
Over those years, passers-by would have seen buildings shaping up very differently – building to a tempest with Dalston Works. When it was completed in 2017, it was the world’s largest CLT building. It was a landmark project which showed how you could use timber construction to create high-density urban housing – across London and beyond. It was built quickly and quietly.
This ten-storey, 121-unit development was made entirely of CLT. All the way – from the external, party and core walls – through to the floors and stairs. It weighed just a fifth of a concrete building of this size, and reduced the number of deliveries during construction by 80 per cent – much to the delight of nearby residents.
A decade later, no residential construction has since matched its ambition. Despite Hackney Council pioneering an unofficial “Wood First” policy in 2012 (which initially turned the borough into a global hotspot, with over 25 completed mass-timber projects), high-rise residential timber construction in London ground to a virtual halt after 2018.
Post-Grenfell, the Government recognised that poor UK Building Regulations had contributed to a chain of failures. While timber was not a factor in the 2017 disaster itself (Grenfell Tower was a concrete structure clad in aluminium composite panels), the subsequent regulatory overhaul has profoundly impacted the sector.
How the UK walked away from timber construction
The ambition for tall residential buildings made from mass timber – able to massively reduce the carbon impact of construction – has slowed dramatically. Timber buildings have continued to face scrutiny – and policy makers have continued to legislate far beyond those buildings which sought to use engineered timbers to reach new heights.
Regulators have pushed structural timber out of construction through bans on the use of combustible materials above an arbitrary height threshold. Even standard lightweight timber frame has been shunted out of local Government procurement (see the ban on any timber in the external walls under Greater London’s Affordable Housing Programme).
Most recently this has included a consultation to restrict timber from consideration under Approved Document B (ADB) – the framework that much of the construction industry uses to understand how compliance with the Building Regulations can be demonstrated.
The results of the consultation are pending. But it seems like in the UK we are being forced to make a choice. Do we actually have to choose between building safely and building sustainably? The answer – demonstrated by Sweden – should be a resounding no.
Why the ADB question is bigger than an 11-metre threshold
The proposed changes to ADB need to be considered carefully. The 11-metre proposal is not, in legal terms, a ban on timber. The consultation itself makes clear that timber can still be used above the proposed threshold where an alternative approach is taken, including a full fire-engineered approach. However, this distinction is extremely important.
ADB is the framework that much of the construction industry uses to understand how compliance with the Building Regulations can be demonstrated. A change which removes timber buildings above a certain height from that prescriptive route could therefore have consequences well beyond the wording of the regulation itself.

KAJ16 Project, Gothenberg
Designers may see additional complexity. Developers may see additional risk. Insurers and warranty providers may see uncertainty. Lenders may become more cautious. And, perhaps most importantly, the wider industry may interpret a threshold as a signal about which construction systems Government considers acceptable.
This is why TDUK’s concern is not simply about a reduction in height thresholds. It is about ensuring that a clear, credible and usable route remains available for buildings whose safety can be demonstrated through engineering evidence.
In our response to the consultation, TDUK proposed an 11-metre threshold for residential buildings and an 18-metre threshold for non-residential buildings within ADB, alongside making explicit that a fire-engineered route can be taken above those thresholds, including approaches based on BS 7974. This would broadly align England with Scotland.
That is not an argument for lower standards. It is an argument for making sure that the regulatory system distinguishes between the limit of prescriptive guidance and the limit of what can be built safely. The two are not the same. And Sweden provides an interesting example of why that distinction matters.
Why the Swedish model matters to England
Walking through Swedish cities – as I did recently on a forest-to-factory tour – the contrast could not be more stark. Multi-storey apartment blocks, ranging from five to seven storeys, made from a mix of CLT, Glulam and LVL, being used alongside timber floor cassettes, wall panels and external cladding, are quickly climbing the skyline.
Of course, our first visit took us to the forest – where we met with Södra, the Swedish forest-owner cooperative. At their sawmilling operations in Värö, technology is used to maximise the value extracted from each tree. CLT production sits on the same integrated site, producing up to 100,000m3 capacity every year.
The impact of this approach can be seen on the ground in Gothenburg, where the Kaj 16 building features 19,900m2 CLT upon an 1,100m3 glulam frame. The building itself features nearly 30,000m2 of floor space 78 metres high – sitting on a two-storey concrete platform.
Meanwhile, at Asby we met with Derome – a third-generation family company with a billion-pound turnover – who took us through their vertically integrated supply chain, including their sawmills, their factory producing modular and panellised construction, and development arm which they use to sell straight to the market.
Today, companies like Derome can assemble

Sodra CLT Factory, Varo
the shell of a 6-storey timber apartment block on-site in just three days. The building becomes weather-tight nearly instantly, so plumbers and electricians can step inside and begin internal work on day four – while outdoor finishes are still being applied. It means the project is completed in weeks – not months.
Meanwhile, on the ground they are also rolling out multi-storey modular timber buildings – straight from their factory onto a building site. The combined effect of efforts like those from Derome, with a mix of owner- occupied, build-to-rent and social housing projects, is that Sweden is making steady progress against its house-building targets, with an 8% increase in housing starts in the first half of 2026.
There is no silver bullet
It would be wrong to claim that Sweden has solved its housing challenge. It has not. Sweden continues to experience housing shortages, particularly in some of its larger urban areas. But it has developed an industrialised construction model capable of turning timber into completed homes quickly and repeatedly.
That matters for England. The UK Government’s objective is to deliver 1.5 million homes over this Parliament. The Timber in Construction Roadmap explicitly connects increased timber use with this housing challenge, identifying modern methods of construction as a means of delivering high-quality homes more productively, quickly and sustainably.
This means the Swedish example should be considered not only as a lesson in low-carbon construction, with upfront carbon emissions as low as 171kgCO2e/m2 (excluding the foundations), but as a lesson in housing delivery.
The Swedish approach of course could not simply be transferred to England. The regulatory systems are different. The scale of the housing markets and crises are different. Our supply chains are different. And there are legitimate technical questions still being researched around the use of engineered timber.
But Sweden provides something extremely valuable. It shows timber construction not as a specialist exception, but as part of a mainstream industrial ecosystem. There we saw factory production and rapid assembly. We saw multi-storey housing. We saw sophisticated engineering. And we saw fire performance designed into the systems.
We should not create a false choice between safety and sustainability
This is ultimately why the ADB debate matters so much. There is an understandable instinct following Grenfell to ask whether a material presents a fire risk. That question must be asked. But it is not the only question.
We should also ask:
- Can the construction system safely manage that risk?
- Can its performance be demonstrated through robust testing and engineering?
- Can the system be manufactured consistently?
- Can it be built correctly and repeatedly?
- Can building control, insurers, lenders and warranty providers understand and have confidence in it?
And, where those questions can be answered positively, why should regulation needlessly prevent that system from being used? These are not questions on choosing sustainability over safety – or any other metric. They are questions about achieving both.
The UK Government’s Timber in Construction Roadmap makes precisely this point in its own way. It identifies fire safety and durability as essential conditions for expanding engineered mass timber, while simultaneously identifying timber as an opportunity to reduce embodied carbon, increase productivity and support housing delivery. Regulation should support these objectives to work together.
England should learn from what Sweden has built
There is an open invitation for Government policy makers to visit Sweden and see this construction model first hand. They will not find that Sweden has all the answers. However, they can view what safe, factory-manufactured timber construction looks like when it is operating at scale.
They should go to see six-storey housing assembled through industrialised timber systems in less than a week. To understand how fire performance is incorporated into those systems. To see how much construction activity can be moved from the building site into a controlled manufacturing environment. And to consider what England could learn as it seeks to deliver more homes, more quickly, while reducing the environmental impact of construction.
The next stage of the Approved Document B review provides an important opportunity to have that conversation. While the consultation closed on 1 July 2026 with more than 500 responses, the Building Safety Regulator is now analysing those responses before making recommendations. We are continuing to meet with them.
Current Government planning anticipates recommendations being published in spring 2027. The objective should be straightforward. They must
- maintain the highest standards of fire safety.
- provide clear, evidence-based routes for demonstrating compliance.
- allow high-performing timber construction systems to develop where their safety can be demonstrated.
- ensure that building safety, housing delivery, productivity and decarbonisation are working towards the same outcome.
Because we should not have to choose between safe buildings and sustainable buildings. With more timber in construction, we can have both.